-
28.05.2012 - 30.05.2012
Global Shutdown... -
29.05.2012 - 31.05.2012
2nd Annual Glob... -
30.05.2012 - 31.05.2012
Bakken Tight Oi... -
13.06.2012 - 15.06.2012 | 09.00
5th Annual Pipe... -
26.06.2012 - 27.06.2012
Plant Shutdowns... -
27.06.2012 - 28.06.2012
Tight Oil Eagle... -
09.07.2012 - 11.07.2012
2nd Annual Glob...
Events in Asia
Details - Drilling Fluids and Cuttings Management Asia 2011
Events in Asia
Event
- Title:
- Drilling Fluids and Cuttings Management Asia 2011
- When:
- 22.02.2011 - 24.02.2011
- Category:
- Oil and Gas events in Asia
Description
Reduce time to drill, increase wellbore stability and maximize recovery from the reservoir through Technical, Management and Environmental Excellence for positive economic return on your well.
Power Forum: 23 February 2011
Workshops: 22 & 24 February 2011
Venue: Bangkok, Thailand
Cost Effective Environment Compliance, here is the key.
With stricter regulations, more demanding, complex fields, extended reach and volatile markets, the challenge is to find more efficient ways to dispose of waste without harming the environment or raising costs.
Drilling Fluids & Cuttings Management Asia 2011 is the industry event you need, highlighting the most relevant spectrum of perspectives from leading players in today’s arena of drilling fluids & waste management.
Regional environmental regulators will share with you their plans and policies, and you can expect fresh insights from leading operators, field experiences from rig contractors and the latest products and technologies from global service providers.
▪ Health, Safety & Environmental Compliance
Design fluid systems to allow inexpensive disposal methods
▪ Excellent Wellbore Pressure Management
Avoid lost time and unsafe conditions due to well control problems
▪ Optimized Drilling Time
Reduce time and cost to drill, case or abandon a well
▪ Wellbore Stability
Prevent wellbore collapse allowing free movement of the drilling tools on bottom and on trips
▪ Minimized Formation Impact
Optimize production by minimized formation damage to pay zone
▪ Reduced Completion Impact
Align fluid design with desired completion technique
Register today using one of these 4 easy ways:
▪ Call : +65 6844 2080
▪ Fax : +65 6844 2060
▪ Email : drillingfluids@arcmediagl...
http://arcmediaglobal.com/drillingfluids



